Shen Tie project equipment is being shipped out in stages.
Release time:
2014-10-07
The Shenyang Railway Bureau has ordered our company’s large-scale water-glass sand vacuum-hardening automatic production line. The equipment has been undergoing phased acceptance inspections at our factory and will soon be painted before being shipped to the customer.
The sand treatment on this line is performed at ambient temperature with a regeneration process, and the productivity is... 20t/h The molding line is fully automatic. The dimensions inside the sand box are: width 1.5m , long 8m , high 0.5m It is mainly used for producing manganese steel castings for railway applications.
1 ) Two units VRH Vacuum hardening chamber, volume per unit 17m3。
2 ) Large flip-mold machine, opening dimensions 2m × 1.5 m ×8.5 m , maximum load 15t。
3 ) Upper vibration compaction equipment
4 ) Other equipment such as sand mixers
Keywords:
Related News
Deepen University-Enterprise Integration & Build an Innovation Highland Baoding Well Foundry Machinery Forges New Chapter of Cooperation with Beijing University of Technology
2026-07-23
Significant Growth in Our Company’s Export Projects
From January to April 2026, our company secured export orders totaling RMB 192 million, representing a 28% year-on-year increase — an encouraging performance!
2026-05-21
2026 Spring Festival Greetings
On February 11, 2026, the Chairman of our company issued an announcement via the OA system. The full text is published as follows: 2026 Spring Festival Greetings
2026-02-11
Charge ahead this year, lay the foundation for next year—keep up the good work!
On December 1, our company’s chairman posted an article on the company’s OA system. The full text is reproduced below: Charge ahead this year, lay a solid foundation for next year—keep up the good work!
2025-12-02
The Kazakhstan project has begun shipping.
Since last year, Kazakhstan’s FORMAT Company has placed orders with our company for six production lines in succession, with a total contract value exceeding 100 million yuan. The first order included a static-pressure line and its accompanying sand-processing line, both of which have now been completed. Recently, the user’s expert team successfully completed the factory acceptance testing and is about to ship the equipment.
2025-08-02